
Single Storey Semi-D
Starting price shown. Prices, layouts and availability change — message us for the latest.
Klebang Ria (8A) is a Single Storey Semi-D in Klebang / Meru, Ipoh, Perak, on 35' x 80' lots, 4 bedrooms and 3 bathrooms, freehold, completing 2028 Q1. Starting at RM548,800.
| Project | Klebang Ria (8A) |
|---|---|
| Property type | Single Storey Semi-D |
| Location | Klebang / Meru, Ipoh, Perak |
| Starting price | From RM548,800 |
| Lot Size | 35' x 80' |
| Bedrooms | 4 |
| Bathrooms | 3 |
| Tenure | Freehold |
| Completion | 2028 Q1 (under construction) |
Indicative figures. Your actual instalment depends on the bank’s valuation, the margin you are approved for and the rate you are offered. Adjust any of it on the instalment calculator.
3 of the 6 projects we cover in Klebang / Meru start lower than Klebang Ria (8A). Cheaper is not automatically better — check tenure, land size and completion date in the same row.
| Project | From | Type | Land | Tenure | Completion |
|---|---|---|---|---|---|
| Klebang Ria (6C&6D) | RM338,000 | Single Storey Terrace House | 22' x 65' & 22' x 70' | Freehold | 2026 Q4 |
| Klemeru 4 | RM398,800 | Single Storey Terrace House | 22' x 70' | Leasehold | 2028 |
| Klemeru 2 | RM488,000 | Double Storey Terrace House | 22' x 75' | Leasehold | Completed (CCC obtained) |
| Klebang Ria (8A) — this page | RM548,800 | Single Storey Semi-D | 35' x 80' | Freehold | 2028 Q1 |
| Klemeru 3 | RM568,000 | Single Storey Semi-D | 45' x 70' | Leasehold | 2027 |
| Klemeru 3 | RM678,000 | 1.5 Storey Semi-D | 45' x 70' | Leasehold | 2027 |
Klebang Ria (8A) starts from RM548,800. That is the entry unit type — corner, end and larger lots are priced higher. Prices move as units sell, so confirm the current chart before budgeting around any figure.
Lots are 35' x 80'. Each home has 4 bedrooms and 3 bathrooms. Room-by-room measurements are on the developer’s floor plan.
Klebang Ria (8A) is in Klebang / Meru, Ipoh, Perak. Nearby: Sentra Mall Ipoh Klebang, Mydin Mall Meru Raya, SJK(C) Poi Lam and SMJK Poi Lam.
Klebang Ria (8A) is Freehold. Freehold has no lease expiry, which is one less variable on financing and resale.
Vacant possession is estimated for 2028 Q1. That is the developer’s target rather than a guaranteed date — check what the SPA measures the completion period from, and the liquidated damages position if it runs late.
Roughly RM2,099 a month on a RM548,800 home with a 10% down payment over 35 years at around 3.7%. This is an estimate, not a loan offer — your margin, tenure and rate are set by the bank. Change any of the numbers on the instalment calculator.
The main upfront item is the 10% down payment, about RM54,880 at the starting price, less whatever the booking fee already covers. On top of that come the loan agreement stamp duty and legal fees, and the MOT stamp duty where the developer does not absorb them. Work your own figure on the upfront cost calculator.
On the published specification the main draws are Freehold, Solar Panel System and 3-Phase Electric. Whether it fits depends on your budget, how long you intend to hold it and how the location works for your daily commute.